Pages

Showing posts with label FMQ. Show all posts
Showing posts with label FMQ. Show all posts

Tuesday, June 15, 2021

Round Up Week 23: Slow Start

In the Studio with Lauren: Class 3 Session 3:
Bias tube appliqué for Celtic designs and Indian Kolam

The class was presented well - I'm getting the hang of hand sewing.  Last week finished my first ever hand stitched binding to finish a quilt because of these classes.

The homework for the Bias tube applique actually had two examples to try out, but they were large I thought for me. Instead I used the technique to make another heart.  From a distance, the work looks rather nice - it's the detail look that shows the rough concave and convex points...

To make the bias tubing I cut a strip from a cereal box and inserted that to get the seam so it was in the center of the tube when pressed - easy peasy!  If I were going to make a larger, more beautiful piece I can see how purchasing the metal tubes would be very useful in making flat tubes.



The lesson this week was on couching - but she used the machine instead of showing hand methods. Actually my machine is not stitching well so I will find a tutorial online to help me do this by hand.

I searched for mechanical sewing machine repair in San Diego and now have a name to try out having the machines maintained.  The previous place more than doubled their prices and I had to return the machine to have the repair refined as it did not work the first time.  So I want a new place for this work.

Five Star Resources:


Megan at Tiny Orchard Quilts has many useful, creative and innovative projects.  Very professional presented.  There are so many tutorials, I had a difficult time picking out a few as examples:

How to Change the Size of a Quilt Block! Make A Block Any Size with These Tips!
How to Calculate Fabric Requirements for a Pattern! Take Your Sketch to a Quilt Pattern!
Gradient Quilt Tutorial: Choose Your 3 Favorite Colors to Make this Easy to Piece Quilt!
The Easy Way to Get PERFECT 1/4" Seam Allowances! Improve your Accuracy and Stop Losing Your Points
Beyond the Free Motion Quilting Basics: Combining Designs and Resources for New FMQ Motifs

Megan will be starting a new summer QAL that will probably be wonderful to do.  I'm in a rush to finish up my bookkeeping so I can start the end of the month. First post about this now at:  https://tinyorchardquilts.com/blogs/news/summer-skies-medallionalong


Darlene Michaud - Videos on piecing, semi-quick recipes, and new series on decluttering to get ready for a cross country move. She is a one person production and posts something when she is inspired to do that.  For her lesson videos she plans ahead and at least usually thinks about the best way to present an idea. Sometimes she includes a lot of personal background information. She does not always post things that the quilt police would approve of.

I'm interested now to see her documenting getting rid of stuff in preparation for putting her family home on the market so she can move from Maine to Mississippi (to be near her son and away from the snow). 

She used to have videos (Organized so you could see progress each month or quarter) where she shared how much money she was earning from doing all the videos, but I can't find the link to that now.  But when I first found her she was making a few hundred a month, then it grew to I think a few thousand the last time I looked.  It was interesting to see the behind the scenes of all that part of YouTube business.

Here are some examples:

Make 2 Half Rectangle Triangle Quilt Blocks at Once
Stained Glass Quilt Block Tutorial
Apple Raisin & Walnut Cornbread - Darlene's Concoctions - tried this delicious!
Brown Sugar Walnut Ice Cream - No Machine, No Cream, 3 Ingredient Base
Crumb Quilt Adventure - https://tinyurl.com/y9zcg63f
Quilting with Darlene - https://tinyurl.com/y3752cyn
Crazy Crumb Quilt Adventure - https://tinyurl.com/yajctndh
Quilt Block Party - https://tinyurl.com/ha4uq2u
Postage Stamp Quilt - https://tinyurl.com/y4tw3tow
Easy Quilt Blocks - https://tinyurl.com/y742k6cc
YouTube Business - found one video https://youtu.be/6uLT3NwrLEk
A-Maze-ing Quilt - https://youtu.be/ocN4r6yWwio - pattern for $1


YouTube Channel: https://www.youtube.com/channel/UCXBQx7Mn77PQ46tRPpW9-oQ/videos
Website: https://quintessentialquilting.com/

Cindy Seitz-Krug.  A few years ago she set out to create and share a free motion quilting design based on starting with a grid.  I keep going back to her videos for inspiration. 

I may use this design in my wavy line quilt... (but enlarge so I do once for every block in the quilt).

Week 16 of "A Grid Design Every Week"; Flip/Flop Baptist Fan
https://youtu.be/lT27dWBgRXI

---------
I went thru my clothes, looking for a certain shirt, and in the process realized that some of the things I had put away had stains.  So plan to go thru again and pull things out - wash the ones that need it and then give them to Goodwill.

I also had a plan to go thru the books on my shelves in the bedroom - There are a few I have put aside, but I am hoping I can come up with some way to group things and then to be able to give away many more.  I decided that anything that had to do with teaching reading or writing I would just let go, so that will be easy.  But then there are cook books, learning language books, math books, novels I haven't read.  So already this is difficult to do.

All I can do is what I can do....

Oh, both of my sewing machines now need maintenance beyond what I can do.  I found a new guy, highly recommended on Yelp - but he will be on holiday until July.  So for the EBHQ classes the last weekend of this month I will just use the time to watch, and cut fabric in preparation for sewing later....







Wednesday, March 16, 2016

Windmill: Initial Quilting

I have finished the initial quilting of the purple and black Cultural Fusion windmill quilt.

This is the quilt I spray basted last month.

It was extremely easy to quilt this project, so right now I'm thinking it might be worth it to set up a table so I can spray baste future projects myself. I will decide after washing the project.

My friend who helped me had suggested just quilting by sewing a line thru the fans, and then to call it done.  That would finish the quilt, but I want to do more quilting.  I think more in this case would be better!

I decided to start by stitching to outline the blades of each fan.  The outsides follow the fabric seams, the inside of each fan has stitching that usually waves over to meet the blade that is below it in the fan.  I will be adding more designs either in the blades or the part of each block that is not a blade, or maybe in both areas I'm not sure of how I will continue this quilting.  I'm mostly pleased with how this initial stitching looks.

11:42 - 1:00 Tues - sewed 8 lines and filled a bobbin
3:52 - 5:00 Tues - sewed 14 lines and ripped one part of a blade that wasn't done correctly. only had three lines left to do!
12:00 - 12:55 Wed/Today- filled bobbin, sewed the last three lines and redid the blade that hadn't been sewn correctly.
======
3 hours and 21 minutes

Here is the initial quilting:





Detail of the center of a fan.  Curved the line
so it lined up with the bottom fan blade.
At the outer edges of each fan blade I followed the shape of the blade.

And here is another outer sides of the blades.

Here is another center of a fan.


Here a view of the back - it's easier to see the quilting without the different fabrics. The lint from the carpet makes the black fabric look grey!


The center of a fan.


Showing the outer blades. You can see how each time I
 turned to create the X to jump from one fan to another.


Another example of outer blades.

Here was my problem though.  The outline of the blade is part of the design.  When I put the binding on, that design will be lost as it is right where the edge of the binding will be.  I should have done this stitching so it was half inch from the outside, so the design would show when the binding is applied. I am going to add an additional line of stitching on the outer blades so the design will show when I apply the binding. I can do that when I add the additional design to the piece.  I'm not going to pick the existing stitching out as I made the size of the stitches as small as possible on my machine at each ending and beginning of quilting, but will learn from this experience so I don't repeat this in another project!  I wondered about it when I was quilting, but didn't think it thru until I was done.  Oh well.  A lesson learned.  Writing it up here to help someone else!  : )



Tuesday, January 26, 2016

Tumbler: After Additional Hour or so the quilting is done! My Jan OMG Done!

Something was wrong with the bobbin, it allowed me to stitch a few inches then the thread broke.  I decided to remove all that stitching then went walking to clear my head.  What was the solution?  I was going to change the needle as that does seem to be a solution to stitching problems, but took the bobbin out and discovered the thread was sticking out oddly.  So I tried to wind these thread onto a new bobbin.  It worked for about a quarter bobbin's worth.  I decided to give it a try.  I'm estimating that took about 30 minutes....  But the stitching was even and nice on my test bits so I put the needle in and finished that line!
http://redletterquilts.blogspot.com/2016/01/omg-its-finished-party-january-2015.html

In another 30 minutes I had finished the remaining three lines.  So done with this stage and done with what I wanted to do this month on this project for my January One Monthly Goal! 

I doubt that I would have finished this quilting so quickly without the call of this challenge, the opportunity to share and meet new folks, and the possibility of winning the beautiful red valentine fabric. So thank you so much Heidi for organizing OMG!  

After 19 hours for the quilting.  4.5 bobbins. January OMG Done!
  
Next steps: 
binding and label!

And thanks again to Candace for helping me figure out how to do the quilting design and encouraging me to just go for it!
I need to practice my binding skills so will save this part of the project to complete after I have made a few mug rugs or something!  I can bring this with me to my once a month sewing group next time it meets, I'm sure someone can guide me there so I have a nice binding to this project.

As a reminder, I started sewing this quilt in 2011, and it's been basted since 2013...
To see the posts about this quilt:
http://quiltquest.blogspot.com/search/label/tumbler

----------------

Now I have a few days before the beginning of a new month so I'm going to use my quilting time to work on the Polaroid Blocks that my Stash Bee/Hive 8 friend Katrin will be compiling to make a quilt for her friend's little daughter, Hanno, who will be going thru chemotherapy now.  If you have time, won't you join in?  If you only have time to find fabrics for the photo part of the block you could send to me and I would put into the frames for Katrin!  

----------------



Thanks for coming by!




Sunday, January 24, 2016

Tumbler Progress: About 3.5 hours (in two sessions) and almost done!

I'm not sure why today's first sewing session went so quickly...

Session One

I started at 4.:49pm and at 6:28pm I had sewn the second lines for one side starting in the center, and even did one line on the other side of the quilt!  So that's 10 angle lines done so far today.  I'm still on the same bobbin so no time was wasted in that regard.

So that's 1 hour 39 minutes if I'm doing my math correctly.  And an average of around 10 minutes for each angle line!  The sewing flowed during this session...

After around 16 hours of quilting.  This is the side that is the most done.  You can click to see the enlarged version.



Session Two (no photos)

I sewed again from 10:47pm to 12:44am.  This time I only did 8 lines.  Near the top of the 9th line at 12:29am I ran out of bobbin.  It took about 7 minutes to get the new bobbin in place and to hide the ends of the threads from where the bobbin ran out.  I started again and then about 8 minutes later the thread got caught and I ended up cutting it to release the material.  I decided it might be too late to continue.

I think I have 4 more lines to go then done with this stage of the project.  There are a few spots where I need to pick out thread that was crossed over and became part of the quilting on the back. For this second sewing (which was the other side of the quilt) there was more pleating that I could not stop from happening.  I tried sewing very slowly, sometimes that seemed to prevent the pleating but there were other times when slow sewing did not help in that regard.  Next project I will use that special top and bottom feeding foot that Katrin reminded me about.

As I travel thru the blocks instead of seeing the colors and fabric, now I'm noticing where I wasn't as careful as I should have been with the stitching even with the FMQing.  I hope the wash will fluff the fabric up so the puckers blend in...

So pretend there is a photo here to show the progress after 18 hours of quilting.  At this stage I've used around 4.5 spools of bobbin.








Thursday, January 21, 2016

Tumbler Progress: additional 3.5 hours adds 15 lines of quilting

Detail of half of the quilt showing
the alternating columns with stitching.
When I was nursing our son, I kept such detailed records of how long and from which side he nursed.  I made charts of the time and condition of diapers when they were changed.  None of that meant anything to anyone. The doctor never asked me for the information, but still I kept lists and charts.  Someday I will probably find those notes and wonder what to do with them...

So now I'm doing the same thing with this tumbler quilt.  Keeping way to many notes that don't really mean anything. But now I will type them in this blog.  It might be interesting to someone wondering how long it takes someone to quilt a tumbler in this design.

First, I'm using a regular pressure foot. It has about a quarter inch on either side of the needle that I am using to guide the stitching.  If I do this design again I will do all the straight lines first, then go back and do the angle lines.  I'll decide after the piece is washed if I use the regular pressure foot again.  There are still a few pieces where there is a pucker in the sewing.  Very small.  I am more sure these will be sort of hidden once it's washed.

I am sewing starting in the center of the quilt and then moving out, always starting at the same top of the quilt.  I'm sewing along the inside of a column of pieces, then skipping a column and doing the same thing on the following column.  Later I will go back so there is a line of stitching on either side of all the seams.

What I did today, I think I will need to do three more times to finish the quilting on the project.  So I have roughly 11 hours of quilting to go!
After 11.5 hours or quilting.  I think I'll have to repeat what I did today three times to have all the lines quilted.



Today I worked about an additional 3.5 hours on the project and finished about 15 lines of mostly angle lines on the quilting.  I have about 45 lines of quilting to go!  (That is how I figure I have around 11 hours of quilting to go until the quilting part of the project is done. (then it'll be the binding and label!))

Here are the detailed notes:
Got started and bobbin ran out, finished the line but didn't record how long it took to sew that first angle line nor to hide the threads and reset the machine up with the new bobbin.
First 2 recorded lines (near center) took 32 minutes - 16 minutes for each angle line.
Next 3 lines took 35 minutes - almost 12 minutes for each angle line.
Final 8 angle lines of the day (toward outside) took 81 minutes - around 8 minutes for each one.
The outside straight line took only 5  minutes to sew.
I'm now on the third full complete bobbin, have added 15 lines of mostly angle lined quilting and have spent roughly additional 3.5 hours.
Will start the next session by winding the bobbin that is now empty so it is ready when I need it.




Wednesday, January 20, 2016

Tumbler Progress: 168 more minutes of sewing plus around an hour more results in 26.5 lines of quilting

You can tell from my blog entries that I have been doing other sewing instead of working on my tumbler quilt! (Pillows, Game boards, Scraps!)

But today I got back to the tumbler for just under three hours of quilting time.  In that amount of time I finished all the second straight lines for the quilt, trimmed the thread and brought the piece downstairs for a photo!
After about 8 hours of quilting and working with the fabric, still using the third bobbin.
So it took me about six minutes to do each of the straight lines that go across the quilt.  How do I sort of know this?  I set  my phone on the stop watch app and clicked when I finished a line and then started the timer again when the needle was in the down position and in place to start another line for stitching! (So I wasn't counting the time to reorient the fabric to get it ready for the next line of stitching at the sewing machine.)  I'm estimating that took about 2 minutes each time so that's additional hour on the quilt.



I learned that I should have done all the horizontal lines at the same time.  The first day of tumbler quilting I had started with trying to do some of the angular lines, but when I crossed those lines with the straight stitching, almost every time, there was a bubble in fabric that I had to work to try to flatten.
Plus about 2 minutes per line or another hour for
turning and setting up to sew again.  That's
about 8 hours on the quilting so far.

When I did the orange peel quilt it felt natural to rotate the quilt after each line was completed to add a different color to the quilt from a different direction, but this did not work with the tumbler quilt.  

I'm thinking it would have been better to do all the horizontal, straight stitching in the tumbler first.  I'm hoping this will get the fabric so it is very firmly oriented where it's supposed to be in the quilt!

I did what I have done so far by starting in the middle then skipping a few seams and sewing again, then I went back to fill things in so there was one line for each seam. After that I went back and filled in the second lines.  I'm hoping when the piece is finished and washed that the bubble of fabric at these intersections will be more or less unnoticeable.

Gosh, my fingers are crossed that when I do the rest of the angular lines that I will not continue to have the bubbling fabric problem!  If I do, I will change the design of the stitching and will do straight lines coming down thru the middle of the tumbler shapes.  Candace at Saltwater Quilts did this for some of her tumbler quilts.  She posted a photo and wrote: I stitched a fourth of an inch above and below each horizontal seam and through the middle of each of the tumblers. This version of her stitching looks terrific, but I had wanted to do the version she did after this with the lines following all the seams so that is what I am trying for in the tumbler. We'll see what happens with my quilt after the next session of sewing!

I thought I had basted my tumbler project quite snugly and completely.  I taped the backing, the batting and the top down on this huge basting table at the adult education class. Then I used all my pins, but them in all the alternating blocks on the inside and in each of the blocks on the perimeter of the project.  But guess it wasn't tight or often enough to prevent bubbling... or maybe it got loose being basted for almost three years before I started the quilting!

I'm pleased with how the quilt looks so far.

Wednesday, December 2, 2015

Charity FMQ Unmarked Baptist Fans, Orange Peel, Feathers

I finished another Quilts for Kids!

This one I had planned on sewing together so the squares would be on point, but I goofed so just have strange corners instead.  The leader of our local Quilts for Kids said it would be okay so I went ahead and basted and free motion quilted.  I started with some feathers in each of the corners, but the pick thread makes it very difficult to see that detail.

I decided to try some unmarked Baptist fans, was afraid I would run out of thread so switched to orange peel design that would use less thread.

It's my first time for both of these.  It would have been easier if my working space were consistent instead of having the strange corners.

So this quilt has several firsts for me:
1.  The first huge mistake with piecing made it so I didn't get to try the on point setting as I wanted to.
2.  First feathers on something more than a practice piece (and those were done in 2012!)
Example Feather - each corner has a different interpretation of a feather.
3.  The first Baptist fans
Unmarked Baptist Fans - they do look nice from a distance!
4.  The first orange peel
Unmarked Orange Peel - Very easy to stitch in the squares.

I didn't break any needles even though I'm just getting back into sewing and quilting again.  Had planned on using some gold thread but that didn't work out so grabbed the one spool of pink that I had just to get going on the project.  My hand was unsteady so guess it's okay that the thread blends into the background in most cases.

I have another quilt with these materials that is made of all squares waiting to be finished.  I wonder how that will end up being quilted?  It will have binding made from bring the fabric from the back to the front.

This one was made with the top and back facing each other, then it was turned inside out.  I've only done this one time before. I think I should have basted this one even though my 'teacher' said I didn't need to.  There is one spot where things bubble with extra fabric.  Perhaps that could have been avoided with some basting.

Still it will be a nice quilt for someone.

It was pretty easy to move my tables so I had extra table behind the sewing machine and to my left - think I will be liking the new sewing space!

I just realized I hadn't posted a full photo of this project.

Made from charms cut from fabric with Studio GO.  Was supposed to be on point, realized after sewn that I had to add corners to make the quilt a rectangle!

Back was one piece, sewn as an envelope then pulled inside out, so there is no binding.

I think this is my fourth finish for QFK.

: )



Here are I think better photos of the project.  Including a few toes!

Saturday, June 1, 2013

Sat June 1: 90 degrees and Baseball Charity Quilt Done

I woke at 9 am all ready to work on the quilt.  After jabbing myself with a pin I decided I needed to get Elmers School glue.  It took some walking in 90 degrees to different stores (Harvard, Central Square, Inman Square) to find the School glue version with the black board - but it was worth it!  After using the glue things went pretty quickly indeed.  I only used a pen in each corner....  I think the puckering in the back carried over to the binding - but it looks pretty nice.

1.  I marked a piece of cardboard to be my
ironing guide so I would crease at the half inch mark.
2.  I added drops of glue, then folded the fabric up again and pressed.
The corners were not perfect... So next time I will be more careful!

3.  The finished top - before washing
4.  The finished back - before washing

We went to Alewife to meet Ba and Bu for dinner at the Summer Shack.

On the way it was fun to see the changes in the trees on our street and throughout Harvard Yard after graduation ceremonies.

On our way back we passed a big party being held in front of the science building - drinking, dancing, talking, fun.
 
Flower petal snow.
 Harvard Yard was all decked out!
Harvard Yard the day after the last graduation ceremony.
The Summer Shack was nice - I had a grilled shrimp salad, DH had scallops and Ba and Bu both had lobster rolls.  Nice conversation and dinner.  DH and I said our goodbyes then walked from Alewife to Porter Square - then took the T to Harvard and walked home.

There was a final party being held in the area in front of the Science building...

Perhaps the last Harvard party for some - on location of winter ice skating rink.
Now I just need to find the plastic bag they sent the QFK kit to me in, and the label for my name! Then I can wash it and send it on it's way!  I was planning on making two quilts, but this took so much time - I think I'd better make the quilt I promised my DH next!

I actually forgot about the label and went ahead and washed the quilt - looks nice - I'll take and post photos tomorrow.  We watched some TV - then heard this loud noise - then the crash of glass when a poster in the kitchen decided to fall down.  What a drag.  I was glad I had leather gloves to help pick up the shards of glass.  Tomorrow we'll have to mop and mop to be sure we get all the glass up off the floor.

It's still very hot....

Thursday, May 16, 2013

Thur May 16: More FMQing

I did more work on the top - now about half done with the FMQing.

When I did the second quarter I started to think I should vary the stitching so I put in some stippling, swirls, and what not.  It looks better I think keeping the consist design - except maybe the inner border could be different.

I am enjoying doing the stitching.  The machine is working like a dream - it would be better if I had a drop in table to put it in, but the pinmoors that I got from Leah Day are working like a charm.  They make it so much easier than safety pins or thread for basting!

I do notice the little bubbles of fabric, mainly on the back.  I put so many pinmoors in I'm surprised there are any, but it still will be a nice quilt for someone to have.

So today I just stayed inside until the evening.  Watching TV and FMQing.  It was a nice day.

I'm not liking the quilt itself though - I'm looking forward to being done and being able to work on projects that I can keep or give to my family.

I called the people who prepared my mom's advanced healthcare directive as the dates are not the same on the different pages - hospice noticed this.  The lady on the phone said she would send the correct pages via email.  When we had the documents drawn up they put the pages in the binder - I didn't notice the date discrepancy.  I am not pleased that after all my mom's efforts that there was a mess up - hope they will just send the file and that will be that (that they do not charge for this!).

The tab on the back of my fitbit broke a few days ago.  I have been able to collect the tip and squeeze it back on, but tonight I pulled it off to compare my steps with my DH and the tip flipped off and I can't find it.  It scratches the material I pin it on when I wear it so I wrote to them to ask for a new cover piece.  I don't want to wreck my clothes with the fitbit  It's different than the one I first had, bu this one has lasted only five months so that's not a very good piece of equipment.   I have had several problems with this fitbit - not synching correctly or at all - not holding a charge.  But fitbit would not send me a new one so I have to charge it a few times a week and have to put up with having the website and phone updated when it feels like it rather than when I am near the computer or turn on the iPhone app.  It's a drag. It's fun to know how many steps I take so I hope they will hurry with sending me a replacement.








Tuesday, May 14, 2013

Tue May 14: FMQing

Beginning FMQing on the charity quilt.
Today, finally, I FMQed!  It was my first time here in Cambridge.  I have the sewing machine on the dining room table - I'm unable to do the large stippling that I had planned on doing, but instead I did the sort of woven design in larger than usual size.

I'm not sure how much time what I got done took me.  I bent one needle very early on but that is the only needle trouble.

Had to refill a bobbin - put it in the holder the wrong way.  It was easy to correct and to rip the bad stitched out.

I think tomorrow I will finish this, and will place the design so it fits in the smaller squares.

Watercolor demo
I walked to Central Square and picked up two watercolor brushes and the paint I needed for the class - then I walked on to the library and the class.  There were not enough desks for the number of students that were there.  I wasn't inspired by the demo - so after it was done, I returned to the art supply store to return the items I had purchased today and the watercolor paper that I got a few weeks ago.  There was no trouble with doing that at all as I had the receipts.  I bought a pad of thick paper and a drawing pen to practice Zendoodling.  DS told me he had purchased a  workbook for me on this, I will ask him to look for it and send to me, but even if he can not do that I can practice from website sites!

I called DH to let him know I was not staying at the class and found out he had rented a zipcar to pick up a monitor - so I was able to meet up with him and go to Brighton to pick that up.  It's in Boston - pretty close though.  Very nice neighborhood.